Project required the drilling of thirty-four 17.5” diameter pilot holes for future 96” diameter pump shafts that would be drilled utilizing blind bore techniques. The pilot holes were drilled in two passes with the initial 8” hole being drilled using [ Read More… ]
The project required drilling two 8” diameter holes for the installation of new waterstops between the selected monolith joints within the dam structure. The holes were required to precisely follow the vertical joints between the monoliths and to deviate no [ Read More… ]