Dam Safety Assurance

This project called for the installation of 278 high-capacity, post-tensioned, multi-strand rock anchors. The anchors ranged in size up to 61-strands with test loads approaching 3000 kips. The anchors were installed in 15-inch diameter boreholes to deviation tolerances of less [ Read More… ]

Dam Safety Assurance

KY Lock Addition

The Kentucky Lock is an existing 600 foot long navigation lock located on the Tennessee River near Grand Rivers, Kentucky. The US Army Corps of Engineers constructed a new 1,200 foot long navigation lock landward of the existing lock. The [ Read More… ]

KY Lock Addition

Creek Protection Project – Appalachian Region US

The Creek Protection Project consisted of several phases of work including increasing the hydraulic capacity of the creek. Coastal installed permanent rock anchors within a post and panel floodwall positioned in the creek. In order to resist the design load, [ Read More… ]

Creek Protection Project – Appalachian Region US

State Road Highway Grouting

The limited mobility grout injected into void spaces within soil or rock, soft soils, or the soil-filled cavities of the bedrock, improved the subsurface soil and rock conditions by filling the void spaces and replacing soft, loose soils with high [ Read More… ]

State Road Highway Grouting

Precision Drilled Vertical Pilot Holes for Blind Bore Shaft Development

Project required the drilling of thirty-four 17.5” diameter pilot holes for future 96” diameter pump shafts that would be drilled utilizing blind bore techniques. The pilot holes were drilled in two passes with the initial 8” hole being drilled using [ Read More… ]

Precision Drilled Vertical Pilot Holes for Blind Bore Shaft Development